1/9th Scale Jaws Orca (NECA Size)

2 years to get this far Filmzy. I don't knowwwwwww. I have a year left to finish. Just please tell me the Mast, Flying bridge, Pulpit, and Barrel Roof aren't as time consuming as the Back Deck, Main Cabin, and Lower Cabin have been. I want to get the cabins done and the roofs on by the end of Summer. Then I'll have 9 months to finish this baby, It is encouraging, watching the "Lumber Yard" as I call it, get smaller and smaller as things get built.
How are you doing C.H.? Are you OK? You're in my thoughts and Prayers, Hoping you're holding it together. Always be strong for yourself and people that need you.
 
The Lower Cabin will have Olde Maple Stain on the walls and furniture. The Forward and V-birth Deck will again be Honey Stain like the back Deck and main cabin.
439549940_1625209044959258_2595526520394320363_n.jpg
 

Your message may be considered spam for the following reasons:

If you wish to reply despite these issues, check the box below before replying.
Be aware that malicious compliance may result in more severe penalties.
Back
Top