This forum is intended for interest gauging and active runs. Due to the transient nature of this forum, please keep all research and ongoing discussion in one of our main forums so your information is not lost.
Only Premium Members can start a new run.
Yeah actually! Right before dealing with some home construction, international family visiting, and getting very sick again- I managed to print and workshop multiple versions with Adam and Lewis to arrive at what we have here- which since sent off to development with the machinist, TXQ.Any updates on any of this / new ETA?
Excellent news about the chambers. I understand these have been a long time coming. As per my conversation with Veracity on FB, they were hoping to lock in the pommel updates by last Monday. Can you speak as to whether the updates were indeed confirmed and if the pommels are in production?Chambers:
About 6AM in the UK- Lewis appears to have been bagging, sorting, and says he will actually be beginning shipments (within the week?). I assume that will be a few at a time. These orders are prioritizing those that were paid/unfulfilled by the UK machinist.
View attachment 1887417
View attachment 1887418
View attachment 1887419
View attachment 1887420
V2: TXQ pommel revisions have taken longer in engineering than expected. Sorry guys we’re just trying to make sure we’re only doing this once
Well Lewis’ communicated goal was last Monday, and in fact the model was locked in and sent over for what should be the last round of engineering checks with TXQ. Sometimes between the model, drawings, the tooling available, software, even the capability of the machine need to be reviewed and revised to arrive at the desired outcome. So- that being said the mill mark was a big round of back and forth revision between one or all of those elements - after last weeks communication, I *believe* the engineers are good on the model/ tooling/ machining code since we actually haven’t had any pushback or questions about it now. As of last friday everything should be OK. Now we are waiting on confirmation of actual machining beginning for those pommel pieces.
How did the new sample turn out?The parts went through several rounds of revision which finally finished late last week. Back and forth with TXQ on those.
Body, switch tabs, pommel, static pommel cap,vented pommel shroud and hidden cap all being physically re sampled right now.
I’m hoping TXQ can get us some in progress action but will otherwise have photos as soon as they are finished “baking”
P.s. in case you’re wondering- I caused the hold up on these because I noticed there may be a potential thread issue on the pommel from that last update. Fingers crossed we are good to go for all the updated parts. (Pending new sample looks good to go)
Great news. So the finished sample gets sent to you, you make revision notes/okay the design, then it goes into production? Best case scenario, how long are we looking at for delivery?Hi Guys, the new part samples were supposed to be shipped end of February, we are simply told the machinist was delayed and should be able to send it (and photos of it) later week
I’ve forwarded your comment to Lewis/ Malaki SkywalkerWho can I message about getting my order cancelled/refunded? Every time I message/email someone I get an initial response and then further messages go ignored.
Pommel sample was looking rough, they are trying again…. Supposed to hear more todayHi Guys, the new part samples were supposed to be shipped end of February, we are simply told the machinist was delayed and should be able to send it (and photos of it) later week