Well Lewis’ communicated goal was last Monday, and in fact the model was locked in and sent over for what should be the last round of engineering checks with TXQ. Sometimes between the model, drawings, the tooling available, software, even the capability of the machine need to be reviewed and revised to arrive at the desired outcome. So- that being said the mill mark was a big round of back and forth revision between one or all of those elements - after last weeks communication, I *believe* the engineers are good on the model/ tooling/ machining code since we actually haven’t had any pushback or questions about it now. As of last friday everything should be OK. Now we are waiting on confirmation of actual machining beginning for those pommel pieces.