«SQUID» Sol's lightsaber from "Acolyte" replica (by Lukyanov) [pre-orders]

Are the new US tariffs going to affect this production run for US customers?
 
Update: all of the "SQUID" sabers are ready to be shipped from the factory (I forgot about the Chinese New Year again, which caused a delay in the deadlines, plus some parts needed to be reworked a bit to make them as cool as possible).

They are all assembled and some of them will be shipped directly to my customers (for those who didn't ordered weathering or installing), the rest will be shipped to me, I hope to finish all my work until the end of March (but may be delayed because of shipping).

All of ordered chassis are ready in full too (assembled and tested). Regarding the board settings, I will contact you personally later.
A few pictures below.

Thanks for your support and patience

1.jpg 2.jpg 3.jpg chassis.jpg
 
Last edited:
Update: all of the "SQUID" sabers are ready to be shipped from the factory (I forgot about the Chinese New Year again, which caused a delay in the deadlines, plus some parts needed to be reworked a bit to make them as cool as possible).

They are all assembled and some of them will be shipped directly to my customers (for those who didn't ordered weathering or installing), the rest will be shipped to me, I hope to finish all my work until the end of March (but may be delayed because of shipping).

All of ordered chassis are ready in full too (assembled and tested). Regarding the board settings, I will contact you personally later.
A few pictures below.

Thanks for your support and patience

View attachment 1913023 View attachment 1913024 View attachment 1913025 View attachment 1913026
Amazing news! this is my most anticipated saber project this year. Any update as to when the factory will ship the finished units to those of us that ordered no weathering or install?
 
Amazing news! this is my most anticipated saber project this year. Any update as to when the factory will ship the finished units to those of us that ordered no weathering or install?
Hey. Are you from the US? It will be shipped to the US during two days as a small batch and then it will be shipped to my customers from my friend inside of the US who will help me.
 
Hey. Are you from the US? It will be shipped to the US during two days as a small batch and then it will be shipped to my customers from my friend inside of the US who will help me.
Yes I am in the US! Thanks for breaking it down, I was just curious about how to expect shipping information.
 
lukyanov what PCB lens cover are you using for your install? do you have a link?
 
For anyone doing their own install, here is my wiring diagram for my install. This is specific to my build and preferences when it comes to installs, but I figured this could cut some of the leg work out of designing the install for some folks. This is using a Proffie 3.9 but the wiring would be pretty much identical for a 2.2 install, only thing different would be some of the pad positions. Enjoy, y'all.
 

Attachments

  • SquidWiringFinal.pdf
    9.6 MB · Views: 46
If anyone has not gotten tracking, check your spam folder. I heard from someone tonight that they didn’t get tracking, but the mystery was solved. I think I need to get some sort of DNS verification for my domain so it doesn’t look like spam.
 
Back
Top